3 <!DOCTYPE work-package SYSTEM "work-package.dtd">
5 <work-package number="1">
6 <name>Requirement Analysis</name>
9 <person-month participant="bologna" number="3"/>
10 <person-month participant="inria" number="4"/>
11 <person-month participant="dfki" number="3"/>
12 <person-month participant="nijmegen" number="6"/>
13 <person-month participant="aei" number="3"/>
14 <person-month participant="trusted-logic" number="1"/>
17 <li>Definition of the application scenarios.</li>
18 <li>Precise articulation of all the functionalities required
19 by the system, and all possible expected interactions
21 <li>Overall requirements of the distribution model of the
26 <p>The work plan is naturally organised in subtasks according
27 to the different basic kind of interactions and manipulation
28 to be considered, namely:</p>
31 <name>Mathematics and the Web.</name>
32 <p>State of the art, standards and
36 <name>Structured and Formal Mathematics.</name>
38 layering of Semantic Components. Requirements for
39 the interaction with tools for the automation of formal
43 <name>Metadata.</name>
44 <p>Classification and data mining for content-based
45 mathematical documents, and key architectural guidelines
46 for the metadata model.</p>
49 <name>Searching and Retrieving.</name>
50 <p>State of the art, use cases and
51 application scenarios.</p>
54 <name>Distribution.</name>
55 <p>Distributed document repositories and
56 peer-to-peer interoperability.</p>
59 <name>Document Authoring.</name>
60 <p>State of the art, use cases and
61 application scenarios.</p>
64 <p>Part of the activity, covering Tasks T1.1-2-6 should be
65 concluded within the first three months, with the
66 preliminary report D1.a. The main aim of this phase is
67 to rapidly reach a good level of inter-operability among the
68 different sites, by implementing a suitable politic of
69 knowledge and skills transfer between the members of the
70 consortium (short visits and/or small thematic workshops,
71 according to the case).</p>
72 <p>However, some delicate issues, such as Metadata, Searching
73 and Retrieving and Distribution (Task T1.3-4-5) will
74 eventually require a deeper analysis (deliverables D1.b and
76 <p>WP1 will be eventually closed during the first meeting of
77 the Project (month six), when all the reports will be
78 discussed and approved.</p>
80 <deliverable file="requirement-analysis/d1a"/>
81 <deliverable file="requirement-analysis/d1b"/>
82 <deliverable file="requirement-analysis/d1c"/>
84 <p>The preliminary report D1.a is not a realmilestone:
85 it should be considered as a first internal draft summarising
86 the main functionalities required by the system and the basic
87 intelligence to add to documents, as markup and/or metadata,
88 to meet these requirements. All these issues will be
89 eventually detailed in D1.b and D1.c, which are real
90 Milestones, since the rest of the work will be largely