3 <!DOCTYPE work-package SYSTEM "work-package.dtd">
5 <work-package number="1">
6 <name>Requirement Analysis</name>
9 <leader file="nijmegen/geuvers"/>
10 <person-month participant="bologna" number="3"/>
11 <person-month participant="inria" number="4"/>
12 <person-month participant="dfki" number="3"/>
13 <person-month participant="nijmegen" number="6"/>
14 <person-month participant="aei" number="3"/>
15 <person-month participant="trusted-logic" number="1"/>
18 <li>Definition of the application scenarios.</li>
19 <li>Precise articulation of all the functionalities required
20 by the system, and all possible expected interactions
22 <li>Overall requirements of the distribution model of the
27 <p>The work plan is naturally organised in subtasks according
28 to the different basic kind of interactions and manipulation
29 to be considered, namely:</p>
32 <name>Mathematics and the Web.</name>
33 <p>State of the art, standards and
37 <name>Structured and Formal Mathematics.</name>
39 layering of Semantic Components. Requirements for
40 the interaction with tools for the automation of formal
44 <name>Metadata.</name>
45 <p>Classification and data mining for content-based
46 mathematical documents, and key architectural guidelines
47 for the metadata model.</p>
50 <name>Searching and Retrieving.</name>
51 <p>State of the art, use cases and
52 application scenarios.</p>
55 <name>Distribution.</name>
56 <p>Distributed document repositories and
57 peer-to-peer interoperability.</p>
60 <name>Document Authoring.</name>
61 <p>State of the art, use cases and
62 application scenarios.</p>
65 <p>Part of the activity, covering Tasks T1.1-2-6 should be
66 concluded within the first three months, with the
67 preliminary report D1.a. The main aim of this phase is
68 to rapidly reach a good level of inter-operability among the
69 different sites, by implementing a suitable politic of
70 knowledge and skills transfer between the members of the
71 consortium (short visits and/or small thematic workshops,
72 according to the case).</p>
73 <p>However, some delicate issues, such as Metadata, Searching
74 and Retrieving and Distribution (Task T1.3-4-5) will
75 eventually require a deeper analysis (deliverables D1.b and
77 <p>WP1 will be eventually closed during the first meeting of
78 the Project (month six), when all the reports will be
79 discussed and approved.</p>
81 <deliverable file="requirement-analysis/d1a"/>
82 <deliverable file="requirement-analysis/d1b"/>
83 <deliverable file="requirement-analysis/d1c"/>
85 <p>The preliminary report D1.a is not a realmilestone:
86 it should be considered as a first internal draft summarising
87 the main functionalities required by the system and the basic
88 intelligence to add to documents, as markup and/or metadata,
89 to meet these requirements. All these issues will be
90 eventually detailed in D1.b and D1.c, which are real
91 Milestones, since the rest of the work will be largely