X-Git-Url: http://matita.cs.unibo.it/gitweb/?a=blobdiff_plain;f=helm%2Fmowgli%2Fhome%2Fxml%2Fwork-packages%2Frequirement-analysis.xml;h=996fce7e0ab133f11d95be64292c643021b18a36;hb=97c2d258a5c524eb5c4b85208899d80751a2c82f;hp=82d379fd64fde75dd0683c6893518243a43f99a2;hpb=d8ad1d26122af00feda930086b6cfa42de0139fe;p=helm.git diff --git a/helm/mowgli/home/xml/work-packages/requirement-analysis.xml b/helm/mowgli/home/xml/work-packages/requirement-analysis.xml index 82d379fd6..996fce7e0 100644 --- a/helm/mowgli/home/xml/work-packages/requirement-analysis.xml +++ b/helm/mowgli/home/xml/work-packages/requirement-analysis.xml @@ -1,9 +1,12 @@ + + Requirement Analysis Month 0 Month 6 + @@ -24,34 +27,41 @@

The work plan is naturally organised in subtasks according to the different basic kind of interactions and manipulation to be considered, namely:

-
-
T1.1
-
Mathematics and the Web. State of the art, standards and - tools.
- -
T1.2
-
Structured and Formal Mathematics. Delineation and + + + Mathematics and the Web. +

State of the art, standards and + tools.

+
+ + Structured and Formal Mathematics. +

Delineation and layering of Semantic Components. Requirements for the interaction with tools for the automation of formal - reasoning.

- -
T1.3
-
Metadata. Classification and data mining for content-based + reasoning.

+ + + Metadata. +

Classification and data mining for content-based mathematical documents, and key architectural guidelines - for the metadata model.

- -
T1.4
-
Searching and Retrieving. State of the art, use cases and - application scenarios.
- -
T1.5
-
Distribution. Distributed document repositories and - peer-to-peer interoperability.
- -
T1.6
-
Document Authoring. State of the art, use cases and - application scenarios.
-
+ for the metadata model.

+ + + Searching and Retrieving. +

State of the art, use cases and + application scenarios.

+
+ + Distribution. +

Distributed document repositories and + peer-to-peer interoperability.

+
+ + Document Authoring. +

State of the art, use cases and + application scenarios.

+
+

Part of the activity, covering Tasks T1.1-2-6 should be concluded within the first three months, with the preliminary report D1.a. The main aim of this phase is @@ -68,10 +78,10 @@ the Project (month six), when all the reports will be discussed and approved.

- - - - + + + +

The preliminary report D1.a is not a realmilestone: it should be considered as a first internal draft summarising the main functionalities required by the system and the basic @@ -80,5 +90,5 @@ eventually detailed in D1.b and D1.c, which are real Milestones, since the rest of the work will be largely driven by them.

-
+