X-Git-Url: http://matita.cs.unibo.it/gitweb/?p=helm.git;a=blobdiff_plain;f=helm%2Fmowgli%2Fhome%2Fxml%2Fwork-packages%2Frequirement-analysis.xml;fp=helm%2Fmowgli%2Fhome%2Fxml%2Fwork-packages%2Frequirement-analysis.xml;h=0000000000000000000000000000000000000000;hp=996fce7e0ab133f11d95be64292c643021b18a36;hb=3ef089a4c58fbe429dd539af6215991ecbe11ee2;hpb=1c7fb836e2af4f2f3d18afd0396701f2094265ff diff --git a/helm/mowgli/home/xml/work-packages/requirement-analysis.xml b/helm/mowgli/home/xml/work-packages/requirement-analysis.xml deleted file mode 100644 index 996fce7e0..000000000 --- a/helm/mowgli/home/xml/work-packages/requirement-analysis.xml +++ /dev/null @@ -1,94 +0,0 @@ - - - - - - Requirement Analysis - Month 0 - Month 6 - - - - - - - - -
    -
  • Definition of the application scenarios.
  • -
  • Precise articulation of all the functionalities required - by the system, and all possible expected interactions - with documents.
  • -
  • Overall requirements of the distribution model of the - library.
  • -
-
- -

The work plan is naturally organised in subtasks according - to the different basic kind of interactions and manipulation - to be considered, namely:

- - - Mathematics and the Web. -

State of the art, standards and - tools.

-
- - Structured and Formal Mathematics. -

Delineation and - layering of Semantic Components. Requirements for - the interaction with tools for the automation of formal - reasoning.

-
- - Metadata. -

Classification and data mining for content-based - mathematical documents, and key architectural guidelines - for the metadata model.

-
- - Searching and Retrieving. -

State of the art, use cases and - application scenarios.

-
- - Distribution. -

Distributed document repositories and - peer-to-peer interoperability.

-
- - Document Authoring. -

State of the art, use cases and - application scenarios.

-
-
-

Part of the activity, covering Tasks T1.1-2-6 should be - concluded within the first three months, with the - preliminary report D1.a. The main aim of this phase is - to rapidly reach a good level of inter-operability among the - different sites, by implementing a suitable politic of - knowledge and skills transfer between the members of the - consortium (short visits and/or small thematic workshops, - according to the case).

-

However, some delicate issues, such as Metadata, Searching - and Retrieving and Distribution (Task T1.3-4-5) will - eventually require a deeper analysis (deliverables D1.b and - D1.c).

-

WP1 will be eventually closed during the first meeting of - the Project (month six), when all the reports will be - discussed and approved.

-
- - - - -

The preliminary report D1.a is not a realmilestone: - it should be considered as a first internal draft summarising - the main functionalities required by the system and the basic - intelligence to add to documents, as markup and/or metadata, - to meet these requirements. All these issues will be - eventually detailed in D1.b and D1.c, which are real - Milestones, since the rest of the work will be largely - driven by them.

-
-