3 <!DOCTYPE work-package SYSTEM "work-package.dtd">
5 <work-package number="1">
6 <name>Requirement Analysis</name>
9 <person-month participant="bologna" number="3"/>
10 <person-month participant="inria" number="4"/>
11 <person-month participant="dfki" number="3"/>
12 <person-month participant="nijmegen" number="6"/>
13 <person-month participant="aei" number="3"/>
14 <person-month participant="trusted-logic" number="1"/>
17 <li>Definition of the application scenarios.</li>
18 <li>Precise articulation of all the functionalities required
19 by the system, and all possible expected interactions
21 <li>Overall requirements of the distribution model of the
26 <p>The work plan is naturally organised in subtasks according
27 to the different basic kind of interactions and manipulation
28 to be considered, namely:</p>
31 <p>Mathematics and the Web. State of the art, standards and
35 <p>Structured and Formal Mathematics. Delineation and
36 layering of Semantic Components. Requirements for
37 the interaction with tools for the automation of formal
41 <p>Metadata. Classification and data mining for content-based
42 mathematical documents, and key architectural guidelines
43 for the metadata model.</p>
46 <p>Searching and Retrieving. State of the art, use cases and
47 application scenarios.</p>
50 <p>Distribution. Distributed document repositories and
51 peer-to-peer interoperability.</p>
54 <p>Document Authoring. State of the art, use cases and
55 application scenarios.</p>
58 <p>Part of the activity, covering Tasks T1.1-2-6 should be
59 concluded within the first three months, with the
60 preliminary report D1.a. The main aim of this phase is
61 to rapidly reach a good level of inter-operability among the
62 different sites, by implementing a suitable politic of
63 knowledge and skills transfer between the members of the
64 consortium (short visits and/or small thematic workshops,
65 according to the case).</p>
66 <p>However, some delicate issues, such as Metadata, Searching
67 and Retrieving and Distribution (Task T1.3-4-5) will
68 eventually require a deeper analysis (deliverables D1.b and
70 <p>WP1 will be eventually closed during the first meeting of
71 the Project (month six), when all the reports will be
72 discussed and approved.</p>
74 <deliverable file="D1.a"/>
75 <deliverable file="D1.b"/>
76 <deliverable file="D1.c"/>
78 <p>The preliminary report D1.a is not a realmilestone:
79 it should be considered as a first internal draft summarising
80 the main functionalities required by the system and the basic
81 intelligence to add to documents, as markup and/or metadata,
82 to meet these requirements. All these issues will be
83 eventually detailed in D1.b and D1.c, which are real
84 Milestones, since the rest of the work will be largely