3 <work-package number="1">
4 <name>Requirement Analysis</name>
7 <person-month participant="bologna" number="3"/>
8 <person-month participant="inria" number="4"/>
9 <person-month participant="dfki" number="3"/>
10 <person-month participant="nijmegen" number="6"/>
11 <person-month participant="aei" number="3"/>
12 <person-month participant="trusted-logic" number="1"/>
15 <li>Definition of the application scenarios.</li>
16 <li>Precise articulation of all the functionalities required
17 by the system, and all possible expected interactions
19 <li>Overall requirements of the distribution model of the
24 <p>The work plan is naturally organised in subtasks according
25 to the different basic kind of interactions and manipulation
26 to be considered, namely:</p>
29 <dd>Mathematics and the Web. State of the art, standards and
33 <dd>Structured and Formal Mathematics. Delineation and
34 layering of Semantic Components. Requirements for
35 the interaction with tools for the automation of formal
39 <dd>Metadata. Classification and data mining for content-based
40 mathematical documents, and key architectural guidelines
41 for the metadata model.</dd>
44 <dd>Searching and Retrieving. State of the art, use cases and
45 application scenarios.</dd>
48 <dd>Distribution. Distributed document repositories and
49 peer-to-peer interoperability.</dd>
52 <dd>Document Authoring. State of the art, use cases and
53 application scenarios.</dd>
55 <p>Part of the activity, covering Tasks T1.1-2-6 should be
56 concluded within the first three months, with the
57 preliminary report D1.a. The main aim of this phase is
58 to rapidly reach a good level of inter-operability among the
59 different sites, by implementing a suitable politic of
60 knowledge and skills transfer between the members of the
61 consortium (short visits and/or small thematic workshops,
62 according to the case).</p>
63 <p>However, some delicate issues, such as Metadata, Searching
64 and Retrieving and Distribution (Task T1.3-4-5) will
65 eventually require a deeper analysis (deliverables D1.b and
67 <p>WP1 will be eventually closed during the first meeting of
68 the Project (month six), when all the reports will be
69 discussed and approved.</p>
71 <deliverable file="D1.a"/>
72 <deliverable file="D1.b"/>
73 <deliverable file="D1.c"/>
75 <p>The preliminary report D1.a is not a realmilestone:
76 it should be considered as a first internal draft summarising
77 the main functionalities required by the system and the basic
78 intelligence to add to documents, as markup and/or metadata,
79 to meet these requirements. All these issues will be
80 eventually detailed in D1.b and D1.c, which are real
81 Milestones, since the rest of the work will be largely